Bookmark and Share
Planning Department Banner, This link takes you back to home page
Environmental & Resource Protection
CEQA Documents Open for Public Review

Initial Studies

Project Name Application # APN Address / Location Owner Name Project Description Public Comment Period Ends

San Vicente Redwoods

Initial Study

Att. 1 - MMRP

Att. 2 - Public Access Plan Part 1 Part 2

Att. 3 - Trails Staging Area Plan

Att. 4-11

181146 Various APN's in Main Tract and Laguna Tract. Property located in the Santa Cruz Mountains. The main tract is located north of Highway 1, east of Swanton Road, south of Jamison Creek Road, and west of Empire Grade. The Laguna Tract is located north of Smith Grade, east of Pine Flat Grade, south of Ice Creak Grade and west of Empire Grade in the Bonny Doon planning area. Peninsula Open Space Trust The project consists of two main components: 1) the approval and implementation of the proposed San Vicente Redwoods Public Access Plan, and 2) the construction and operation of an approximately 38-mile multiple use trail system over approximately 8,500 acres and a parking area in the San Vicente Redwoods of the Santa Cruz Mountains. The trail system and the parking area (with approximately 90 parking spaces) would be developed in phases. The proposed trails would be available for hiking, biking, horse riding, dog walking (on-leash only), small group gatherings, as well as nature observation. March 29, 2019
Paul Minnie Mixed Use 181170

026-043-14

2606 Paul Minnie Avenue

Dave Smith, PM Investors LLC The proposal is to demolish an existing single-family dwelling and associated outbuildings and to construct two 1,413 square foot professional office buildings and a separate 7,115 square foot residential building containing 15 for-rent apartments, ranging in size from 445 to 680 square feet, and to grade approximately 368 cubic yards of grading. This requires the approval of a Commercial Development Permit. March 11, 2019
           
   

 

     

 

County EIR's

Project Name Document Public Comment Period Ends

Nissan of Santa Cruz Project    Notice of Availability  

Nissan of Santa Cruz Project    Draft EIR      Final EIR

Figure 2-3 - Conceptual Site Plan

Technical Appendices:  A   B   C   D   E   F   G   H   I   J   K

 

Draft EIR February 20, 2018  5 PM

 

EIR's

Project Name Application # APN Address / Location Owner Name Project Description Public Comment Period Ends